-**[REQ-TECH-5]** All system components shall be synchronised to the same time.
For high risk:
-**[REQ-TECH-6]** All system clock drifts shall be monitored.
-**[REQ-TECH-6]** All system time drifts shall be monitored.
-**[REQ-TECH-7]** The product shall be designed in a way, that all cryptographic keys can be replaced with user controlled keys.
The listed requirement shall be implemented, if the risk of the given factor is defined as follows.
@@ -1377,8 +1377,8 @@ There are three different types of assessments used in this document.
#### 6.2.0.6 REQ-TECH-6
**Requirement:** All system clock drifts shall be monitored.<br/>
**Objective:** Where multiple monitoring sources all operate they shall have consistent clocks where any drift or lack of synchronization shall be accurately documented and notification provided to administrator.<br/>
**Requirement:** All system time drifts shall be monitored.<br/>
**Objective:** Where multiple monitoring sources all operate they shall have consistent system time where any drift or lack of synchronization shall be accurately documented and notification provided to administrator.<br/>
**Preparation:**
1. Have the product initialised and available with the default configuration and required credentials.