Commit a361e218 authored by Santeri Toikka's avatar Santeri Toikka
Browse files

Dropped redundant content

parent d7fb56de
Loading
Loading
Loading
Loading
+0 −41
Original line number Diff line number Diff line
@@ -10,49 +10,8 @@ Copyright Year: 2025

# Intellectual Property Rights

Essential patents

IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The declarations pertaining to these essential IPRs, if any, are publicly available for **ETSI members and non-members**, and can be found in ETSI SR 000 314: _"Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards"_ , which is available from the ETSI Secretariat. Latest updates are available on the [ETSI IPR online database](https://ipr.etsi.org/).

Pursuant to the ETSI Directives including the ETSI IPR Policy, no investigation regarding the essentiality of IPRs, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document.

Trademarks

The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners. ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.

**DECT™**, **PLUGTESTS™**, **UMTS™** and the ETSI logo are trademarks of ETSI registered for the benefit of its Members. **3GPP™** , **LTE™** and **5G ™** logo are trademarks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. **oneM2M™** logo is a trademark of ETSI registered for the benefit of its Members and of the oneM2M Partners. **GSM®** and the GSM logo are trademarks registered and owned by the GSM Association.

# Foreword

> DRAFT FOREWORD - DO NOT CONSIDER THE CONTENT

This draft Harmonised European Standard (EN) has been produced by ETSI Technical Committee Cyber Working Group for EUSR (CYBER-EUSR), and is now submitted for the combined Public Enquiry and Vote phase of the ETSI Standardisation Request deliverable Approval Procedure (SRdAP).

It is one of a series of standards prepared under the Commission's standardisation request to the European Committee for Standardisation (CEN), the European Committee for Electrotechnical Standardisation (Cenelec) and the European Telecommunications Standards Institute (ETSI) as regards products with digital elements in support of Regulation (EU) 2024/2847 of the European Parliament and of the Council of 23 October 2024 on horizontal cybersecurity requirements for products with digital elements and amending Regulations (EU) No 168/2013 and (EU) 2019/1020 and Directive (EU) 2020/1828 (Cyber Resilience Act).

`The present document has been prepared under the Commission's standardisation request C(2025) 618 final to provide one voluntary means of conforming to the requirements of Regulation (EU) No 2024/2847 of the European Parliament and of the Council of 23 October 2024 on horizontal cybersecurity requirements for products with digital elements and amending Regulations (EU) No 168/2013 and (EU) No 2019/1020 and Directive (EU) 2020/1828 (Cyber Resilience Act).`

Once the present document is cited in the Official Journal of the European Union under that Regulation, compliance with the normative clauses of the present document given in table A.1 confers, within the limits of the scope of the present document, a presumption of conformity with the corresponding requirements of that Regulation and associated EFTA regulations.

Transposition table

The Harmonised Standard shall have appropriate transposition periods specified. A Harmonised Standard confers presumption of conformity when it has been published in the Official Journal of the European Union (OJEU) and transposed by a member state.

The Technical Body may propose different dates to the default ones (3, 6, 18). Technical Bodies who wish to propose different dates are advised to indicate this clearly in the approved committee draft.

+----------------------------------------------------------------+---------------------------------+
| Proposed national transposition dates                                                            |
+:===============================================================+:================================+
| Date of latest announcement of this EN (doa):                  | 3 months after ETSI publication |
+----------------------------------------------------------------+---------------------------------+
| Date of latest publication of new National Standard \          | 6 months after doa              |
| or endorsement of this EN (dop/e):                             |                                 |
+----------------------------------------------------------------+---------------------------------+
| Date of withdrawal of any conflicting National Standard (dow): | 18 months after doa             |
+----------------------------------------------------------------+---------------------------------+

The Technical Body should advise the ETSI Secretariat if the above default national transposition dates are inappropriate for the particular standard.

# Modal verbs terminology

# Introduction